Editing an Embedded Report
\The Sandbox \PB History & Future \New in PB 4 \OLE 2.0 \Editing a Report
Drag Target
Editing a
Report
Embedding
a Report
InPlace
Activation
MergeOption
OLE 2.0
Container App
OLE 2.0
Control Functions
OLE Automation
Functions
OLE Control
OLE Features &
InfoMaker
OLE 2.0 Support
PowerScript
Automation
Registering
Reports
Saving Embedded
or Linked Objects
  1. Double-click it.
  2. The InfoMaker Report painter opens and displays the report.

  3. Modify the report.
  4. Select Exit from the File menu to return to Word and insert the modified report in the current document. 
PBL Peeper PB Help PB History
& Future About Us Feedback Site Map

Google
 
Web www.techno-kitten.com
www.sybase.com